Subsidy is released after scheme approval; it is not an instant invoice discount. Your DISCOM confirms the final amount.
BEFORE YOU DECIDE
Rules for Gujarat
Benchmark cost less central subsidy and a 10% consumer share (5% for SC/ST), only up to 2.18 kWp DC.
Commissioning must be on or after 22 October 2026. Even a small increase above 2.18 kWp removes eligibility for this state addition.
The benchmark is ₹50,000/kW for the first 2 kW and ₹45,000/kW thereafter. It is not the installer's selling price.
Recipients cannot add rooftop capacity for three years. Existing-system extensions need a separate assessment of previous benefits and cumulative capacity.
Payment is through the participating DISCOM after approval. GST, structure and quote differences are not assumed to be covered. The notification also refers to a separate ₹2,950 waiver of specified meter/connectivity charges for eligible systems up to 6 kW; this is not added as cash subsidy here.
A subsidy estimate is not an approval. Confirm the scheme conditions before ordering your system.
Residential electricity connection and an eligible rooftop installation.
Domestic-content compliant modules, using Indian-made cells and modules.
Apply through the national portal, use a registered vendor and obtain DISCOM approval.
Prior subsidies, extensions and other ownership models require a separate assessment.
Compare state rules & source coverage 36 states and union territories
Central rates are covered nationwide. State additions are calculated only for verified formulas or explicit table entries. “Needs verification” does not mean that no subsidy is available. This directory is not a claim that every state grant has been verified.
Andaman and Nicobar Islands
State addition: needs verification
Central cap: ₹85,800 for an eligible new home system.
Additional state assistance is not verified in this calculator. This does not mean that no state scheme exists.
Government benchmarks and vendor prices are different. Your quote may include taxes, roof structure, cabling, labour and site-specific work. Enter the complete pre-subsidy quote to compare. Three 545 W panels are 1.635 kWp, so rounding that to 1.64 before calculation changes the result.
Does a larger system receive more subsidy?
Central assistance stops increasing after 3 kWp: ₹78,000 in standard states or ₹85,800 in special-category states/UTs. Gujarat's additional 2026 grant applies only when the entire installed DC capacity is at most 2.18 kWp. Choose a size for your electricity needs and available roof, not only the subsidy.
Is this a government application?
No. This is Solmack Solar's estimate tool. It does not submit a subsidy claim or reserve scheme funds. Apply through the official PM Surya Ghar portal (opens in a new tab) and follow your DISCOM's process.
Sources reviewed 13 November 2026. Rates and budgets may change. Verified national implementation window: through 31 March 2027. Generation incentives, electricity-bill savings, loans and agricultural schemes are excluded. Estimates are rounded for display; calculations use the exact entered capacity. No calculator inputs are stored or submitted.